PREVENTIVE MAINTENANCE WORK LIST
The control list can be optimized according to specific equipment condition and customer’s requests
Visual control of physical state of the equipment and battery
Thermographic survey on equipment and battery
Fans, capacitors and batteries working over the expecting time life check
Condition of electrolytic (DC) and AC capacitors check
Equipment and battery rooms fans control
Correct partial outgoing current check on rectifier bridge. Ripple on battery measure.
Battery charge cycle check
Control of the electrical parameters: rectifier and emergency mains input voltage, rectifier bridge partialisation, battery charging voltage level, DC bus bar insulating level to earth, output inverter voltage, inverter current, inverter to mains phase displacement, output neutral to earth voltage, output inverter capacitors filter current, electrical and thermal working point. Data record on specific TABLE
Battery discharge and recharge, cells equalization check, internal resistance and thermographic reliefs. Data record on specific TABLE.
Commutation test: switching inverter→ emergency mains→ inverter. On DC systems rectifier1→ rectifier2
In manual by-pass: to check the maximum-minimum inverter output voltage thresholds
In manual by-pass: emergency mains switch off, inverter frequency working by oscillator control. Return on mains synchronization
In manual by-pass: check of remote and on board alarms
In manual by-pass (complete UPS disconnection): old and defective parts substitution
In manual by-pass (complete UPS disconnection): check and tighten of all terminal connections
In manual by-pass (complete UPS disconnection): cleaning of all parts and contacts with specific deoxidant
Spare part stock control. Stock optimization proposals
Recommendations, proposals and system modification advises
Final test report compilation